Route Planning
Map route requirements, trench depth, and site access before deploying Wheel Trencher Chakra RS100.

- | Attachment
Tractor
75–105 HP
PTO / Hydraulic
40–100 m/hr, depending on trench depth and soil condition
50 mm, 65 mm, 80 mm
Up to 450 mm
5–6 L/hr during trenching
vUrban construction and infrastructure expansion projects frequently require underground utility installation within existing paved environments where surface preservation is a critical project requirement. The Chakra RS100 Construction Wheel Trencher is suited for projects involving road crossings, utility upgrades, industrial developments, and municipal infrastructure expansion where precise pavement cutting is essential. Its wheel-based cutting system enables controlled trench formation on asphalt and concrete surfaces while minimizing disruption to surrounding infrastructure.
This capability is particularly valuable for construction programs operating within active transportation corridors, commercial zones, and developed urban environments. By reducing unnecessary pavement removal and reinstatement requirements, project teams can optimize construction schedules, lower restoration workloads, and maintain continuity of adjacent site activities throughout utility installation operations.
PROJECT EXECUTION
Construction
Modern utility networks increasingly require installation within existing road reserves, access corridors, and developed construction zones. The Chakra RS100 Construction Utility Wheel Trencher supports underground installation of fibre optic networks, electrical distribution cables, street lighting infrastructure, drainage connections, and utility service extensions. Its controlled cutting capability is particularly suitable for roadside installations, industrial estates, transport facilities, and commercial developments where trench precision directly influences reinstatement quality.
The machine also supports last-mile connectivity projects requiring utility connections from primary networks to individual facilities or service areas. Accurate trench dimensions facilitate efficient cable and conduit placement while reducing excavation overbreak, helping contractors maintain installation standards and improve overall project execution efficiency.

Construction
Successful trenching within paved construction environments depends on careful planning, utility detection, and pavement management strategies. The Chakra RS100 Utility Corridor Wheel Trencher supports projects where maintaining existing surface integrity is essential during underground infrastructure installation. Prior to execution, project teams should complete subsurface utility investigations, pavement condition assessments, and alignment verification to minimise conflicts with existing assets.
Construction managers should also establish traffic management plans, spoil disposal procedures, and reinstatement methodologies appropriate to project specifications. Continuous monitoring of trench dimensions, cutting tool condition, and surface stability further supports compliance with engineering requirements. Coordinated planning between utility installers, civil contractors, and asset owners is essential to ensure efficient construction delivery while minimising disruption to operational infrastructure.
WORKFLOW
Map route requirements, trench depth, and site access before deploying Wheel Trencher Chakra RS100.
Use the attachment setup to keep trench output consistent across project sites, road edges, smart-city corridors, and underground utility zones.
Cleaner trench profiles help utility laying, inspection, backfill, and civil finishing teams proceed with less rework.
Autocracy Machinery can help match machine configuration, brochure details, and application guidance to the project.
APPLICATION SUPPORT
Share your site conditions, output goals, and timeline so the Autocracy team can guide model fit, brochure details, and next steps for your project.
Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.
| Feature | Value |
|---|---|
| Aux Hydraulic Oil Flow (Min) | >25 LPM |
| Machine Overall Length | 5200 mm |
| Machine Overall Width | 2600 mm |
| Machine Overall Height | 1500 mm |
| Gross Weight | 2000 kgs |
| Cutting Tool Type | Carbide-tipped bullet teeth with angle holders |
Common questions about using Wheel Trencher Chakra RS100 in this application.
Industry model fit in Bolivia
For Construction deployment on Bolivia project sites, Wheel Trencher Chakra RS100 is considered when a attachment must handle active jobsites, compacted ground, access-controlled work fronts, and staged civil activity. The model should be reviewed against route cutting, trench preparation, and utility corridor work where line accuracy matters, site productivity, crew coordination, depth control, and fast mobilisation, and the way crews hand work over after each pass.
The first comparison for Wheel Trencher Chakra RS100 should be route clearance, equipment movement, working width, daily output, and safety coordination, because those factors usually decide field fit before horsepower, headline capacity, or attachment choice.
Wheel Trencher Chakra RS100 can support building services, drainage, foundations, road-edge utilities, and site preparation, depending on route condition, access, output target, operator workflow, and site support availability.
This model page is meant to support a more practical conversation about construction fit, brochure review, transport planning, deployment timing, and quote needs.
A better construction shortlist connects trench depth, trench width, spoil handling, route crossings, surface reinstatement, and carrier fit with active jobsites, compacted ground, access-controlled work fronts, and staged civil activity, so Wheel Trencher Chakra RS100 is reviewed against the actual job sequence.