Route Planning
Map route requirements, trench depth, and site access before deploying Mayura TO.

- | Equipment
Tractor
>60 HP
PTO / Hydraulic
300 m/hr (150 m/hr in soft soil, 90 m/hr in hard soil)
110–280 mm
Up to 1800 mm
30–60 mm
Contemporary construction projects increasingly require integrated utility installation methods that minimize site disruption and accelerate project delivery. The Mayura TO construction trencher is suited for developments involving transport infrastructure, industrial facilities, urban expansion, and utility network deployment where installation efficiency is critical. Its one-pass operating capability allows trench excavation, duct placement, and backfilling to be completed within a single workflow, reducing equipment movements across active construction sites.
This approach is particularly valuable on projects with restricted working windows, traffic management requirements, or limited access corridors. By consolidating multiple activities into one operation, project teams can better coordinate construction sequencing, optimize resource allocation, and maintain progress across linear infrastructure developments while reducing temporary site occupancy.
PROJECT EXECUTION
Construction
Contemporary construction projects increasingly require integrated utility installation methods that minimize site disruption and accelerate project delivery. The Mayura TO construction trencher is suited for developments involving transport infrastructure, industrial facilities, urban expansion, and utility network deployment where installation efficiency is critical. Its one-pass operating capability allows trench excavation, duct placement, and backfilling to be completed within a single workflow, reducing equipment movements across active construction sites.
This approach is particularly valuable on projects with restricted working windows, traffic management requirements, or limited access corridors. By consolidating multiple activities into one operation, project teams can better coordinate construction sequencing, optimize resource allocation, and maintain progress across linear infrastructure developments while reducing temporary site occupancy.

Construction
Successful utility installation within construction environments requires careful planning of excavation sequences, service alignments, and traffic interface management. The Mayura TO infrastructure installation machine supports projects where rapid utility deployment must be integrated with broader civil construction activities. Before execution, project teams should complete utility surveys, verify subsurface conditions, and establish clear installation tolerances to prevent conflicts with existing infrastructure.
Operational priorities should also include spoil management, access planning, and coordination between trenching and downstream commissioning activities. Implementing a one-pass installation methodology can help reduce equipment congestion, streamline site logistics, and improve overall construction efficiency. Continuous monitoring of trench quality and installed assets further supports compliance with engineering specifications and long-term infrastructure performance.
WORKFLOW
Map route requirements, trench depth, and site access before deploying Mayura TO.
Use the attachment setup to keep trench output consistent across project sites, road edges, smart-city corridors, and underground utility zones.
Cleaner trench profiles help utility laying, inspection, backfill, and civil finishing teams proceed with less rework.
Autocracy Machinery can help match machine configuration, brochure details, and application guidance to the project.
APPLICATION SUPPORT
Share your site conditions, output goals, and timeline so the Autocracy team can guide model fit, brochure details, and next steps for your project.
Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.
| Feature | Value |
|---|---|
| ID of Duct roll (adjustable) | 850 mm (adjustable) |
| Width of Duct Roll | 600 mm |
| OD of Duct roll | Up to 2000 mm |
| Fuel Consumption Rate | 5–6 L/hr |
| Max Backfilling Depth: | 2000 mm |
| Max Blades Filling Width: | 2500 mm |
| Min Blades Filling Width: | 1000 mm |
| Overall Length: | 10500 mm |
| Overall Width: | 3200 mm |
| Overall Height: | 4500 mm |
Common questions about using Mayura TO in this application.
| Attachment
Industry model fit in Brazil
For Construction deployment on Brazil project sites, Mayura TO is considered when a equipment must handle active jobsites, compacted ground, access-controlled work fronts, and staged civil activity. The model should be reviewed against route cutting, trench preparation, and utility corridor work where line accuracy matters, site productivity, crew coordination, depth control, and fast mobilisation, and the way crews hand work over after each pass.
The first comparison for Mayura TO should be route clearance, equipment movement, working width, daily output, and safety coordination, because those factors usually decide field fit before horsepower, headline capacity, or attachment choice.
Mayura TO can support building services, drainage, foundations, road-edge utilities, and site preparation, depending on route condition, access, output target, operator workflow, and site support availability.
This model page is meant to support a more practical conversation about construction fit, brochure review, transport planning, deployment timing, and quote needs.
A better construction shortlist connects trench depth, trench width, spoil handling, route crossings, surface reinstatement, and carrier fit with active jobsites, compacted ground, access-controlled work fronts, and staged civil activity, so Mayura TO is reviewed against the actual job sequence.