Support Vehicle
Tractor

Tractor
>50 HP
PTO / Hydraulic
Post Hole Digger
Equipment
The Mayura P Post Hole Digger is a heavy-duty tractor-mounted digging and pole-erection machine engineered for infrastructure projects that demand precision, safety, and faster field execution. Designed for utility contractors, solar EPC companies, OFC and telecom infrastructure developers, defence engineering teams, agricultural contractors, and power distribution agencies, the machine combines deep-hole excavation with controlled pole lifting and positioning to improve productivity across demanding job sites.
Compatible with tractors above 50 HP, the machine supports digging depths up to 2000 mm (7 feet) using interchangeable augers ranging from 150 mm to 450 mm (6-18 inches). The heavy-duty auger system features replaceable cutting bullets that efficiently penetrate soft, medium, and hard soil conditions, making it suitable for optical fiber (OFC) projects, solar mounting structures, utility pole installation, agricultural fencing, defence infrastructure, and foundation preparation.
Powered by a PTO and hydraulic transmission system, the Mayura P delivers reliable power transfer, smooth hydraulic control, and consistent performance during continuous digging and lifting operations. Its rugged gearbox, heavy-duty PTO shaft, and durable structural frame are designed for long service life under demanding working environments.
The integrated hydraulic pole erection system supports lifting and positioning of poles up to 24 feet in height with a maximum lifting capacity of 1 metric ton. Equipped with a telescopic boom, worm winch mechanism, and hydraulic lifting cylinders, the machine enables safe, stable, and accurate pole placement while significantly reducing manual handling and minimizing dependence on cranes.
The Mayura P Hydraulic Post Hole Digger is widely deployed across OFC and telecom network expansion, solar power projects, defence infrastructure development, agricultural fencing, electrical distribution networks, and civil construction. By combining excavation and pole erection into a single solution, it helps contractors improve installation speed, reduce labour requirements, and maintain consistent quality across large-scale infrastructure projects.
Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.
Tractor
>50 HP
PTO / Hydraulic
20 LPM
0-7 Feet
1 Meter
6-18 Inches
24 Feet
12mm
2000mm
2500Kgs
Discover what makes the Mayura P stand out from the competition
The tractor-mounted design provides excellent field mobility, operational stability, and reliable performance across OFC, solar, defence, agriculture, utility, and infrastructure project sites.
Compatible with tractors above 50 HP, the machine delivers dependable digging power and smooth hydraulic operation for continuous field applications.
The PTO and hydraulic transmission system ensure efficient power delivery, precise hydraulic control, and reliable performance during excavation and pole erection operations.
With a maximum digging depth of 2000 mm (7 feet), the machine supports accurate deep-hole excavation for OFC infrastructure, utility poles, solar foundations, agricultural fencing, defence projects, and civil construction.
Interchangeable augers ranging from 150 mm to 450 mm (6–18 inches) provide flexibility for different foundation, pole, and structural installation requirements.
The hydraulic pole erection system supports lifting heights up to 24 feet, enabling safe, stable, and controlled installation of utility, telecom, solar, and fencing poles.
BEST SUITED FOR INDUSTRIES
Match Mayura P with industry use cases where equipment reliability, field output, and site readiness matter most.
The Mayura P enables fast and accurate hole digging and pole erection for OFC network expansion, improving installation efficiency across broadband, telecom, and communication infrastructure projects.
The machine prepares precise foundation holes and installs support structures for solar farms, helping EPC contractors accelerate project execution while maintaining consistent installation quality and productivity.
Built for demanding field conditions, the Mayura P supports rapid infrastructure development, perimeter security fencing, utility pole installation, and temporary facility construction across defence project sites.
The machine efficiently prepares holes for fencing posts, irrigation systems, orchards, and farm infrastructure, reducing manual labour while improving productivity and installation accuracy across agricultural operations.
PRODUCT FIT
Understand how Mayura P fits project planning, field deployment, and daily operating priorities.
Designed for OFC and telecom infrastructure, solar power projects, defence installations, agricultural fencing, utility distribution, and civil construction, the Mayura P delivers efficient hole digging and precise pole erection.
Suitable for soft, medium, and hard soil conditions, the machine supports planned excavation, accurate pole positioning, and streamlined workflow across remote, rural, and large-scale infrastructure project sites.
Compatible with tractors above 50 HP, the Mayura P integrates easily into existing equipment fleets, helping contractors improve machine utilization and reduce dependence on additional lifting equipment.
Combining deep-hole excavation and hydraulic pole erection in one machine, the Mayura P reduces labour requirements, shortens installation time, improves safety, and enhances productivity across infrastructure development projects.
Pole erection machine | Equipment
Common questions about Mayura P specifications, applications, and project fit.

Model details in Bolivia
Mayura P is listed for Bolivia buyers who need to compare machine capability, applications, specifications, and quote readiness for practical field deployment.
Post hole digger
Use this page to review Mayura P around rural access, terrain variation, route preparation, carrier availability, trench control, and output reliability.
model fit guidance, export coordination, brochure support, and Bolivia quotation planning