USE CASE
Suitable for construction utility trenching and urban infrastructure work across project sites, road edges, smart-city corridors, and underground utility zones.

Compact trencher | Equipment
Self Propelled
Petrol
20 HP
Hydraulic Transmission
120–200 mm
Up to 600 mm
12,28 V,Ah
Dhruva HYT is configured for construction utility trenching and urban infrastructure work where controlled output and reliable site performance are essential.
Dhruva HYT helps teams working across project sites, road edges, smart-city corridors, and underground utility zones improve clean utility trenches, predictable production, and smoother site coordination.
APPLICATION FIT
Suitable for construction utility trenching and urban infrastructure work across project sites, road edges, smart-city corridors, and underground utility zones.
Supports high route productivity for Construction rollout programs.
Helps maintain clean utility trenches, predictable production, and smoother site coordination for quicker installation and restoration.
Walk Behind Trencher is used for construction utility trenching and urban infrastructure work where route consistency and execution speed directly impact rollout schedules.
Teams deploy Dhruva HYT across project sites, road edges, smart-city corridors, and underground utility zones with planning around utility drawings, site access, trench dimensions, traffic constraints, and reinstatement plans.
The machine helps maintain cleaner worksite output for utility laying, inspection, backfill, and civil finishing teams.
PROJECT EXECUTION
Construction
Walk Behind Trencher is used for construction utility trenching and urban infrastructure work where route consistency and execution speed directly impact rollout schedules.
Teams deploy it across project sites, road edges, smart-city corridors, and underground utility zones with planning around utility drawings, site access, trench dimensions, traffic constraints, and reinstatement plans.
The machine helps maintain cleaner worksite output for utility laying, inspection, backfill, and civil finishing teams.

Construction
Maintain consistent trench depth and alignment to reduce rework during construction utility trenching and urban infrastructure work and site reinstatement.
Plan route productivity based on utility drawings, site access, trench dimensions, traffic constraints, and reinstatement plans.
Use predictable trench output to improve handoff quality between utility laying, inspection, backfill, and civil finishing teams.
WORKFLOW
Map route requirements, trench depth, and site access before deploying Dhruva HYT.
Use the attachment setup to keep trench output consistent across project sites, road edges, smart-city corridors, and underground utility zones.
Cleaner trench profiles help utility laying, inspection, backfill, and civil finishing teams proceed with less rework.
Autocracy Machinery can help match machine configuration, brochure details, and application guidance to the project.
APPLICATION SUPPORT
Share your site conditions, output goals, and timeline so the Autocracy team can guide model fit, brochure details, and next steps for your project.
Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.
| Feature | Value |
|---|---|
| Trench Capacity | 30-150 m/hr |
| Aux hydraulic oil flow(Min) | 40 @ 150 bar lpm |
| Chain Type | Roller With K2 |
| Gross weight | 600 kgs |
| Overall length | 2250 mm |
| Overall width | 900 mm |
| Overall height | 1650 mm |
| Operating Height | 1200 mm |
Common questions about using Dhruva HYT in this application.
Dhruva HYT supports construction utility trenching and urban infrastructure work where consistent output, route control, and field productivity matter.
It is suited for work across project sites, road edges, smart-city corridors, and underground utility zones, especially where teams need clean utility trenches, predictable production, and smoother site coordination.
Share utility drawings, site access, trench dimensions, traffic constraints, and reinstatement plans with Autocracy Machinery so the team can guide model fit, brochure details, and next steps.
Plan the work sequence from setup through utility laying, inspection, backfill, and civil finishing teams, including site access, output targets, and support requirements.
Yes. Consistent trench output helps downstream teams handle installation, inspection, backfill, and restoration work with fewer corrections.
Project, operations, and site teams should confirm route access, output goals, trench dimensions, and support needs before deployment.
