Route Planning
Map route requirements, trench depth, and site access before deploying Vedhan 150.

Vedhan 150 | Attachment
Tractor
35 - 60 HP
60 - 120 holes/hour
900 mm
10-20 LPM
120 - 160 bar
150-300 mm
Optical Fiber Cable deployment projects frequently require the installation of utility poles, route markers, distribution structures, and supporting telecom infrastructure along linear network corridors. Consistent foundation preparation is critical to maintaining pole alignment, structural stability, and route design specifications. The Vedhan 150 is engineered to support these requirements through accurate drilling of pole foundation holes across greenfield routes, roadside alignments, rural connectivity projects, and network expansion programs.
Its ability to create uniform hole diameters and depths helps telecom contractors maintain installation consistency while reducing dependency on manual excavation methods. As a Vedhan 150 OFC Post Hole Digger, the machine supports efficient preparation of pole locations across long deployment stretches, helping project teams accelerate route development activities while maintaining compliance with engineering and installation requirements.
PROJECT EXECUTION
Solar Energy
Modern fiber network projects often require pole-based infrastructure where underground deployment is impractical or where rapid network expansion is required. The Vedhan 150 supports drilling operations for telecom poles, route identification markers, access control structures, and network support installations across utility corridors and last-mile connectivity programs. Its drilling capability enables contractors to prepare foundation locations efficiently while maintaining the spacing and alignment standards specified within network design plans.
Acting as a Vedhan 150 Telecom Pole Installation Machine, it assists field teams in establishing stable foundations for aerial fiber deployment systems. The machine is particularly valuable in distributed project environments where numerous pole locations must be completed within strict construction schedules while ensuring reliable structural support for communication infrastructure assets.


Solar Energy
Successful OFC deployment depends on maintaining efficient progress across surveying, foundation preparation, pole erection, cable installation, and network commissioning activities. Delays during pole foundation development can directly impact downstream construction schedules and increase project costs. Project teams therefore prioritize drilling accuracy, productivity, and repeatability across large route sections.
The Vedhan 150 supports these objectives by enabling consistent hole preparation for telecom infrastructure installations while reducing variability associated with manual excavation. As a Vedhan 150 OFC Infrastructure Drilling Machine, it helps contractors improve resource utilization, maintain construction sequencing, and support faster deployment of pole-based fiber networks. This structured approach contributes to improved installation quality, predictable project timelines, and efficient execution of large-scale optical fiber infrastructure programs.
WORKFLOW
Map route requirements, trench depth, and site access before deploying Vedhan 150.
Use the attachment setup to keep trench output consistent across solar park rows, inverter blocks, and power evacuation corridors.
Cleaner trench profiles help cable laying, earthing, backfilling, and commissioning teams proceed with less rework.
Autocracy Machinery can help match machine configuration, brochure details, and application guidance to the project.
APPLICATION SUPPORT
Share your site conditions, output goals, and timeline so the Autocracy team can guide model fit, brochure details, and next steps for your project.
Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.
| Feature | Value |
|---|---|
| Machine Overall Length | 2200 - 2400 mm |
| Machine Overall Width | 800 - 1000 mm |
| Machine Overall Height | 1600 - 1800 mm |
| Machine Weight | 150 - 300 kg |
Common questions about using Vedhan 150 in this application.
Industry model fit in India
Vedhan 150 Vedhan 150 is presented for Solar Energy applications on India project sites, where a attachment has to work around solar parks, cable corridors, pile rows, open sites, and long internal utility runs. This page adds india-focused context for post hole digger, so teams can judge whether the model supports repeatable output, cable-route accuracy, panel-field access, and EPC schedule control.
Start by checking Vedhan 150 against array layout, cable depth, tracker clearance, soil profile, and commissioning milestones; that route-specific review is more useful than treating every post hole digger page as the same model brochure.
Common solar energy use cases for Vedhan 150 include DC cable trenches, earthing routes, tracker support works, inverter corridors, and solar EPC utilities, provided the site setup supports the machine, crew movement, and next work stage properly.
Use this model page to discuss Solar Energy fit, specification limits, transport readiness, brochure details, and quote requirements with Autocracy Machinery.
project teams in India should confirm hole specification, erection workflow, transport readiness, and pole or post type before shortlisting Vedhan 150, especially when solar parks, cable corridors, pile rows, open sites, and long internal utility runs affect access or productivity.