Route Planning
Map route requirements, trench depth, and site access before deploying Mayura P.
| | |
|---|---|
| | |
| | |
| | |
| | |
| | |

Pole erection machine | Equipment
Tractor
>50 HP
PTO / Hydraulic
20 LPM
0-7 Feet
1 Meter
6-18 Inches
Mayura P is configured for construction utility trenching and urban infrastructure work where controlled output and reliable site performance are essential.
Mayura P helps teams working across project sites, road edges, smart-city corridors, and underground utility zones improve clean utility trenches, predictable production, and smoother site coordination.
PROJECT EXECUTION
Construction
Post Hole Digger is used for construction utility trenching and urban infrastructure work where route consistency and execution speed directly impact rollout schedules.
Teams deploy it across project sites, road edges, smart-city corridors, and underground utility zones with planning around utility drawings, site access, trench dimensions, traffic constraints, and reinstatement plans.
The machine helps maintain cleaner worksite output for utility laying, inspection, backfill, and civil finishing teams.

Construction
Maintain consistent trench depth and alignment to reduce rework during construction utility trenching and urban infrastructure work and site reinstatement.
Plan route productivity based on utility drawings, site access, trench dimensions, traffic constraints, and reinstatement plans.
Use predictable trench output to improve handoff quality between utility laying, inspection, backfill, and civil finishing teams.
WORKFLOW
Map route requirements, trench depth, and site access before deploying Mayura P.
Use the attachment setup to keep trench output consistent across project sites, road edges, smart-city corridors, and underground utility zones.
Cleaner trench profiles help utility laying, inspection, backfill, and civil finishing teams proceed with less rework.
Autocracy Machinery can help match machine configuration, brochure details, and application guidance to the project.
APPLICATION SUPPORT
Share your site conditions, output goals, and timeline so the Autocracy team can guide model fit, brochure details, and next steps for your project.
Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.
| Feature | Value |
|---|---|
| Lifting height | 24 Feet |
| Steel wire rope | 12mm |
| Working depth | 2000mm |
| Gross Weight | 2500Kgs |
Common questions about using Mayura P in this application.
Industry model fit
Mayura P is a tractor-mounted post hole digger and pole erection machine for construction sites that need repeatable footing holes, utility pole installation, lighting poles, fencing posts, and temporary infrastructure support without depending on separate crane crews for every lift.
For construction work, Mayura P helps contractors plan pole and post installation around site access, auger diameter, hole depth, pole weight, soil condition, tractor availability, and crew safety requirements.
The machine combines auger drilling with hydraulic pole handling, making it useful for streetlight poles, CCTV poles, site boundary works, power distribution support, access-road lighting, and service infrastructure inside active project sites.
Mayura P can reduce manual digging, lifting dependency, alignment rework, and idle time between drilling and erection tasks when construction teams need consistent output across multiple pole points.
Use this page to review Mayura P specifications, brochure details, operating fit, transport readiness, and quote requirements for construction contractors, developers, EPC teams, and civil infrastructure projects.