whatsapp

+91 87904 73345

Search

FIND A DEALER

industry

arrow for industry

product

arrow for product

resources

arrow for resources

About us

Contact us

Phone number+91 87904 73345
logo

Industries

DropDownArrow

Products

DropDownArrow

Resources

DropDownArrow
About usContact us
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌

Built for Tough Sites. Ready for Your Project.

From trencher machines and solar EPC attachments to aquatic weed harvesters and utility equipment, Autocracy Machinery delivers rugged solutions for infrastructure, telecom, water, and agriculture projects.

autocracy

Autocracy Machinery Private Limited manufactures trenchers, attachments, aquatic cleaning machines, forklifts, and utility equipment for India and global project sites.

Plot No.72/A, I.D.A. Phase-1, Lane-3, B N Reddy Nagar, Cherlapalli, Hyderabad, Telangana - 500051, India

+91 87904 73345
linkedinyoutubetwitterfacebook
Privacy PolicySitemapTerms & Conditions
About usCareersFAQsContact usHire on rentFind a dealer
ProductsBrochureBlogVideos
Email sales team+91 87904 73345

Copyright 2026 Autocracy Machinery. All rights reserved.

‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌

Vedhan 150 Vedhan 150 for Solar Energy Applications

Vedhan 150

Vedhan 150 Pole Erection Machine for OFC

Vedhan 150

Vedhan 150 | Attachment

Support Vehicle

Tractor

Horsepower

35 - 60 HP

Hole digging rate

60 - 120 holes/hour

Hole Depth

900 mm

Required Hydraulic Flow

10-20 LPM

Required Hydraulic Pressure

120 - 160 bar

Hole Diameter

150-300 mm

OFC Project Fit

Optical Fiber Cable deployment projects frequently require the installation of utility poles, route markers, distribution structures, and supporting telecom infrastructure along linear network corridors. Consistent foundation preparation is critical to maintaining pole alignment, structural stability, and route design specifications. The Vedhan 150 is engineered to support these requirements through accurate drilling of pole foundation holes across greenfield routes, roadside alignments, rural connectivity projects, and network expansion programs.

Its ability to create uniform hole diameters and depths helps telecom contractors maintain installation consistency while reducing dependency on manual excavation methods. As a Vedhan 150 OFC Post Hole Digger, the machine supports efficient preparation of pole locations across long deployment stretches, helping project teams accelerate route development activities while maintaining compliance with engineering and installation requirements.

FIELD PRIORITIES

  • Drills uniform pole foundation holes for telecom and fiber network projects.
  • PTO-driven auger delivers reliable performance across varied ground conditions.
  • Supports rapid route development with accurate and repeatable hole placement.

PROJECT EXECUTION

How the Vedhan 150 fits the worksite

Solar Energy

Use Case Applications - OFC, Utility Corridors & Last-Mile Connectivity

Modern fiber network projects often require pole-based infrastructure where underground deployment is impractical or where rapid network expansion is required. The Vedhan 150 supports drilling operations for telecom poles, route identification markers, access control structures, and network support installations across utility corridors and last-mile connectivity programs. Its drilling capability enables contractors to prepare foundation locations efficiently while maintaining the spacing and alignment standards specified within network design plans.

Acting as a Vedhan 150 Telecom Pole Installation Machine, it assists field teams in establishing stable foundations for aerial fiber deployment systems. The machine is particularly valuable in distributed project environments where numerous pole locations must be completed within strict construction schedules while ensuring reliable structural support for communication infrastructure assets.

Vedhan 150 Pole Installation Machine
Vedhan 150 Pole Installation Machine

Solar Energy

Execution Priorities for OFC

Successful OFC deployment depends on maintaining efficient progress across surveying, foundation preparation, pole erection, cable installation, and network commissioning activities. Delays during pole foundation development can directly impact downstream construction schedules and increase project costs. Project teams therefore prioritize drilling accuracy, productivity, and repeatability across large route sections.

The Vedhan 150 supports these objectives by enabling consistent hole preparation for telecom infrastructure installations while reducing variability associated with manual excavation. As a Vedhan 150 OFC Infrastructure Drilling Machine, it helps contractors improve resource utilization, maintain construction sequencing, and support faster deployment of pole-based fiber networks. This structured approach contributes to improved installation quality, predictable project timelines, and efficient execution of large-scale optical fiber infrastructure programs.

WORKFLOW

From route planning to handoff

1

Route Planning

Map route requirements, trench depth, and site access before deploying Vedhan 150.

2

Controlled Trenching

Use the attachment setup to keep trench output consistent across solar park rows, inverter blocks, and power evacuation corridors.

3

Installation Handoff

Cleaner trench profiles help cable laying, earthing, backfilling, and commissioning teams proceed with less rework.

4

Support And Sizing

Autocracy Machinery can help match machine configuration, brochure details, and application guidance to the project.

APPLICATION SUPPORT

Need Vedhan 150 for Solar Energy?

Share your site conditions, output goals, and timeline so the Autocracy team can guide model fit, brochure details, and next steps for your project.

Precision Machines. Project-Ready.

Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.

FeatureValue
Machine Overall Length2200 - 2400 mm
Machine Overall Width800 - 1000 mm
Machine Overall Height1600 - 1800 mm
Machine Weight150 - 300 kg

Solar Energy FAQs

Common questions about using Vedhan 150 in this application.

More Models in Vedhan Series

Mayura P

Pole erection machine | Equipment

Mayura P Pole erection machine for Agriculture
Support VehicleTractor
Horsepower>50 HP
Transmission TypePTO / Hydraulic

Vedhan 50

| Attachment

Vedhan 50 Post Hole Digger for OFC
Support VehicleTractor
Horsepower35 – 60 HP
Hole digging rate60 – 120 holes/hour

Industry model fit

Vedhan 150 Vedhan 150 for Solar Energy

For Solar Energy deployment in field projects, Vedhan 150 Vedhan 150 is considered when a attachment must handle solar parks, cable corridors, pile rows, open sites, and long internal utility runs. The model should be reviewed against pole, post, and footing-point work where hole repeatability and positioning are important, repeatable output, cable-route accuracy, panel-field access, and EPC schedule control, and the way crews hand work over after each pass.

The first comparison for Vedhan 150 should be array layout, cable depth, tracker clearance, soil profile, and commissioning milestones, because those factors usually decide field fit before horsepower, headline capacity, or attachment choice.

Vedhan 150 can support DC cable trenches, earthing routes, tracker support works, inverter corridors, and solar EPC utilities, depending on route condition, access, output target, operator workflow, and site support availability.

This model page is meant to support a more practical conversation about solar energy fit, brochure review, transport planning, deployment timing, and quote needs.

A better solar energy shortlist connects auger diameter, hole depth, soil condition, tractor capacity, pole handling, and crew safety with solar parks, cable corridors, pile rows, open sites, and long internal utility runs, so Vedhan 150 is reviewed against the actual job sequence.