USE CASE
Suitable for defence utility, tactical infrastructure, and protected corridor trenching across border infrastructure, camp utilities, and rugged access routes.

Cable trenching machine | Attachment
Tractor
60–120 HP
PTO / Hydraulic
40–150 m/hr
150–280 mm
Up to 1750 mm
4–8 L/hr
Rudra 150XT is configured for defence utility, tactical infrastructure, and protected corridor trenching where controlled output and reliable site performance are essential.
Rudra 150XT helps teams working across border infrastructure, camp utilities, and rugged access routes improve dependable trench output, mobility, and consistent execution in demanding sites.
APPLICATION FIT
Suitable for defence utility, tactical infrastructure, and protected corridor trenching across border infrastructure, camp utilities, and rugged access routes.
Supports high route productivity for Defence rollout programs.
Helps maintain dependable trench output, mobility, and consistent execution in demanding sites for quicker installation and restoration.
Trenchers is used for defence utility, tactical infrastructure, and protected corridor trenching where route consistency and execution speed directly impact rollout schedules.
Teams deploy Rudra 150XT across border infrastructure, camp utilities, and rugged access routes with planning around terrain access, deployment speed, trench dimensions, operator safety, and support readiness.
The machine helps maintain cleaner worksite output for utility placement, protection works, and field infrastructure teams.
PROJECT EXECUTION
Defence
Trenchers is used for defence utility, tactical infrastructure, and protected corridor trenching where route consistency and execution speed directly impact rollout schedules.
Teams deploy it across border infrastructure, camp utilities, and rugged access routes with planning around terrain access, deployment speed, trench dimensions, operator safety, and support readiness.
The machine helps maintain cleaner worksite output for utility placement, protection works, and field infrastructure teams.

Defence
Maintain consistent trench depth and alignment to reduce rework during defence utility, tactical infrastructure, and protected corridor trenching and site reinstatement.
Plan route productivity based on terrain access, deployment speed, trench dimensions, operator safety, and support readiness.
Use predictable trench output to improve handoff quality between utility placement, protection works, and field infrastructure teams.
WORKFLOW
Map route requirements, trench depth, and site access before deploying Rudra 150XT.
Use the attachment setup to keep trench output consistent across border infrastructure, camp utilities, and rugged access routes.
Cleaner trench profiles help utility placement, protection works, and field infrastructure teams proceed with less rework.
Autocracy Machinery can help match machine configuration, brochure details, and application guidance to the project.
APPLICATION SUPPORT
Share your site conditions, output goals, and timeline so the Autocracy team can guide model fit, brochure details, and next steps for your project.
Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.
| Feature | Value |
|---|---|
| Aux hydraulic oil flow | 20 lpm |
| Gross weight | 1900 kgs |
| Overall length | 4.8 mts |
| Overall width | 2.2 mts |
| Overall height | 1.3 mts |
Common questions about using Rudra 150XT in this application.
Rudra 150XT supports defence utility, tactical infrastructure, and protected corridor trenching where consistent output, route control, and field productivity matter.
It is suited for work across border infrastructure, camp utilities, and rugged access routes, especially where teams need dependable trench output, mobility, and consistent execution in demanding sites.
Share terrain access, deployment speed, trench dimensions, operator safety, and support readiness with Autocracy Machinery so the team can guide model fit, brochure details, and next steps.
Plan the work sequence from setup through utility placement, protection works, and field infrastructure teams, including site access, output targets, and support requirements.
Yes. Consistent trench output helps downstream teams handle installation, inspection, backfill, and restoration work with fewer corrections.
Project, operations, and site teams should confirm route access, output goals, trench dimensions, and support needs before deployment.
Pipeline trencher | Attachment
Trench Digger | Attachment
Cable trenching machine | Attachment
Torque Tube Installation | Equipment

Weed Harvester | Equipment
Lake cleaning machine | Equipment
