Route Planning
Map route requirements, trench depth, and site access before deploying Mayura TL.

- | Equipment
Tractor
Up to 1800 mm
110-900 mm
>90 HP
PTO / Hydraulic
300 m/hr soft, 200 m/hr hard; 1800 mm × 180 mm: 150 m/hr soft, 90 m/hr hard
5 – 6 litres
Solar infrastructure requires efficient underground cable installation to connect photovoltaic arrays, inverter stations, transformers, and substations across large project sites. The Mayura TL is engineered to support these requirements by combining precision trench excavation with integrated material handling in a single machine. Its adjustable trench depth and width enable contractors to create cable trenches that meet different installation specifications while maintaining consistent excavation quality. The built-in hydraulic loader also assists in handling excavated soil and construction materials, reducing the need for additional loading equipment during project execution. As a Mayura TL Solar Cable Trencher, the machine helps improve workflow efficiency by completing trenching and material movement simultaneously. This integrated approach reduces equipment deployment, lowers labour requirements, and accelerates underground cable installation, allowing solar developers to complete projects faster while maintaining reliable construction quality across utility-scale renewable energy developments.
PROJECT EXECUTION
Solar Energy
The Mayura TL is designed to support multiple underground infrastructure activities throughout solar power projects. It is used for trenching cable routes between solar arrays, inverter stations, transformer yards, battery storage facilities, and grid connection points. The machine also performs efficiently in utility corridors and last-mile electrical connectivity projects where continuous trenching and spoil management are essential.
Its integrated hydraulic loader simplifies material handling by loading excavated soil or aggregates without requiring separate equipment, improving productivity across the worksite. Working as a Mayura TL Trenching Machine for Solar Utility, it enables contractors to complete excavation and site preparation more efficiently while maintaining consistent trench dimensions.
Faster cable installation, reduced machine movements, improved site organization, and efficient use of available resources help contractors deliver underground utility infrastructure with greater speed and operational efficiency.


Solar Energy
Large-scale solar projects demand equipment capable of maintaining consistent performance throughout extended construction schedules. The Mayura TL delivers dependable excavation and loading through its PTO-driven hydraulic system, providing smooth control for both trenching and material handling operations. Its high trenching speed enables rapid cable route preparation, while the integrated bucket loader supports uninterrupted workflow by quickly removing excavated soil and transporting construction materials where required.
The machine's robust structure allows reliable operation across varying terrain conditions while minimizing downtime between excavation and loading tasks. Operating as a Mayura TL Renewable Energy Trench Cutter Machine, it helps contractors reduce labour dependency, optimize equipment utilization, and improve overall project productivity.
Consistent trench quality, efficient spoil management, lower operating costs, and faster infrastructure execution make the Mayura TL a practical solution for modern solar utility projects and expanding renewable energy networks.
WORKFLOW
Map route requirements, trench depth, and site access before deploying Mayura TL.
Use the attachment setup to keep trench output consistent across solar park rows, inverter blocks, and power evacuation corridors.
Cleaner trench profiles help cable laying, earthing, backfilling, and commissioning teams proceed with less rework.
Autocracy Machinery can help match machine configuration, brochure details, and application guidance to the project.
APPLICATION SUPPORT
Share your site conditions, output goals, and timeline so the Autocracy team can guide model fit, brochure details, and next steps for your project.
Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.
| Feature | Value |
|---|---|
| Lift Height: | 2.0 – 3.5 m |
| Lifting Capacity | 1500 kg |
| Bucket Capacity | 0.12 – 0.15 cubic metre |
| Breaker Chisel Diameter | 45 mm |
| Operating Weight | 130 kg |
| Working Speed | 250 – 600 BPM |
| Blade Width | 2400 mm |
| Blade Height | 850 mm |
| Blade Thickness | 10 mm |
| Overall Length | 13000 mm |
| Overall Width | 2800 mm |
| Overall Height | 3000 mm |
| Gross Weight | 8100 kg |
Common questions about using Mayura TL in this application.
Industry model fit in India
Mayura TL is presented for Solar Energy applications on India project sites, where a equipment has to work around solar parks, cable corridors, pile rows, open sites, and long internal utility runs. This page adds india-focused context for trenchers, so teams can judge whether the model supports repeatable output, cable-route accuracy, panel-field access, and EPC schedule control.
Start by checking Mayura TL against array layout, cable depth, tracker clearance, soil profile, and commissioning milestones; that route-specific review is more useful than treating every trenchers page as the same model brochure.
Common solar energy use cases for Mayura TL include DC cable trenches, earthing routes, tracker support works, inverter corridors, and solar EPC utilities, provided the site setup supports the machine, crew movement, and next work stage properly.
Use this model page to discuss Solar Energy fit, specification limits, transport readiness, brochure details, and quote requirements with Autocracy Machinery.
project teams in India should confirm soil condition, daily metres, trench profile, access width, and downstream installation speed before shortlisting Mayura TL, especially when solar parks, cable corridors, pile rows, open sites, and long internal utility runs affect access or productivity.