USE CASE
Suitable for defence utility, tactical infrastructure, and protected corridor trenching across border infrastructure, camp utilities, and rugged access routes.
| | |
|---|---|
| | |
| | |
| | |
| | |
| | |

- | Equipment
Tractor
>90 HP
PTO/Hydraulic
Up to 1800 mm
110–900 mm
Up to 300 m/hr
5–6 litres/hr
Mayura TW is configured for defence utility, tactical infrastructure, and protected corridor trenching where controlled output and reliable site performance are essential.
Mayura TW helps teams working across border infrastructure, camp utilities, and rugged access routes improve dependable trench output, mobility, and consistent execution in demanding sites.
APPLICATION FIT
Suitable for defence utility, tactical infrastructure, and protected corridor trenching across border infrastructure, camp utilities, and rugged access routes.
Supports high route productivity for Defence rollout programs.
Helps maintain dependable trench output, mobility, and consistent execution in demanding sites for quicker installation and restoration.
Trenchers is used for defence utility, tactical infrastructure, and protected corridor trenching where route consistency and execution speed directly impact rollout schedules.
Teams deploy Mayura TW across border infrastructure, camp utilities, and rugged access routes with planning around terrain access, deployment speed, trench dimensions, operator safety, and support readiness.
The machine helps maintain cleaner worksite output for utility placement, protection works, and field infrastructure teams.
PROJECT EXECUTION
Defence
Trenchers is used for defence utility, tactical infrastructure, and protected corridor trenching where route consistency and execution speed directly impact rollout schedules.
Teams deploy it across border infrastructure, camp utilities, and rugged access routes with planning around terrain access, deployment speed, trench dimensions, operator safety, and support readiness.
The machine helps maintain cleaner worksite output for utility placement, protection works, and field infrastructure teams.

Defence
Maintain consistent trench depth and alignment to reduce rework during defence utility, tactical infrastructure, and protected corridor trenching and site reinstatement.
Plan route productivity based on terrain access, deployment speed, trench dimensions, operator safety, and support readiness.
Use predictable trench output to improve handoff quality between utility placement, protection works, and field infrastructure teams.
WORKFLOW
Map route requirements, trench depth, and site access before deploying Mayura TW.
Use the attachment setup to keep trench output consistent across border infrastructure, camp utilities, and rugged access routes.
Cleaner trench profiles help utility placement, protection works, and field infrastructure teams proceed with less rework.
Autocracy Machinery can help match machine configuration, brochure details, and application guidance to the project.
APPLICATION SUPPORT
Share your site conditions, output goals, and timeline so the Autocracy team can guide model fit, brochure details, and next steps for your project.
Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.
| Feature | Value |
|---|---|
| Lift Height | 2.0 – 3.5 m |
| Lifting Capacity: | 1500 kg |
| Bucket Capacity | 0.12 – 0.15 cubic metre |
| Overall Length | 1300mm |
| Overall Width | 2800 mm |
| Overall Height | 3000 mm |
| Gross Weight | 8100 kg |
Common questions about using Mayura TW in this application.
| Attachment
Heavy duty trencher | Attachment
PTO driven trencher | Attachment
