USE CASE
Suitable for solar EPC cable trenching, earthing, and utility routing across solar park rows, inverter blocks, and power evacuation corridors.
| | |
|---|---|
| | |
| | |
| | |
| | |
| | |

- | Equipment
Tractor
Up to 1800 mm
110-900 mm
>90 HP
PTO / Hydraulic
300 m/hr soft, 200 m/hr hard; 1800 mm × 180 mm: 150 m/hr soft, 90 m/hr hard
5 – 6 litres
Mayura TL is configured for solar EPC cable trenching, earthing, and utility routing where controlled output and reliable site performance are essential.
Mayura TL helps teams working across solar park rows, inverter blocks, and power evacuation corridors improve clean cable routes, controlled trench dimensions, and faster EPC execution.
APPLICATION FIT
Suitable for solar EPC cable trenching, earthing, and utility routing across solar park rows, inverter blocks, and power evacuation corridors.
Supports high route productivity for Solar Energy rollout programs.
Helps maintain clean cable routes, controlled trench dimensions, and faster EPC execution for quicker installation and restoration.
Trenchers is used for solar EPC cable trenching, earthing, and utility routing where route consistency and execution speed directly impact rollout schedules.
Teams deploy Mayura TL across solar park rows, inverter blocks, and power evacuation corridors with planning around row spacing, cable depth, earthing runs, soil condition, and access between arrays.
The machine helps maintain cleaner worksite output for cable laying, earthing, backfilling, and commissioning teams.
PROJECT EXECUTION
Solar Energy
Trenchers is used for solar EPC cable trenching, earthing, and utility routing where route consistency and execution speed directly impact rollout schedules.
Teams deploy it across solar park rows, inverter blocks, and power evacuation corridors with planning around row spacing, cable depth, earthing runs, soil condition, and access between arrays.
The machine helps maintain cleaner worksite output for cable laying, earthing, backfilling, and commissioning teams.


Solar Energy
Maintain consistent trench depth and alignment to reduce rework during solar EPC cable trenching, earthing, and utility routing and site reinstatement.
Plan route productivity based on row spacing, cable depth, earthing runs, soil condition, and access between arrays.
Use predictable trench output to improve handoff quality between cable laying, earthing, backfilling, and commissioning teams.
WORKFLOW
Map route requirements, trench depth, and site access before deploying Mayura TL.
Use the attachment setup to keep trench output consistent across solar park rows, inverter blocks, and power evacuation corridors.
Cleaner trench profiles help cable laying, earthing, backfilling, and commissioning teams proceed with less rework.
Autocracy Machinery can help match machine configuration, brochure details, and application guidance to the project.
APPLICATION SUPPORT
Share your site conditions, output goals, and timeline so the Autocracy team can guide model fit, brochure details, and next steps for your project.
Built for performance. Trusted by contractors, municipalities, and EPC teams across sectors.
| Feature | Value |
|---|---|
| Lift Height: | 2.0 – 3.5 m |
| Lifting Capacity | 1500 kg |
| Bucket Capacity | 0.12 – 0.15 cubic metre |
| Breaker Chisel Diameter | 45 mm |
| Operating Weight | 130 kg |
| Working Speed | 250 – 600 BPM |
| Blade Width | 2400 mm |
| Blade Height | 850 mm |
| Blade Thickness | 10 mm |
| Overall Length | 13000 mm |
| Overall Width | 2800 mm |
| Overall Height | 3000 mm |
| Gross Weight | 8100 kg |
Common questions about using Mayura TL in this application.
| Attachment
Heavy duty trencher | Attachment